Greece Case STudy

Bath to the Future: A Full Guest Bathroom Remodel in Greece, NY Near the Lake

Greece Case STudy
Before Remodel - Greece, NY
Shower area
Shower Demo
Image
Image
Shower Wall & Floor
Image
Floor and Shower
Image
Image
Finished Bathroom Remodel from Window

    Bath to the Future: A Full Guest Bathroom Remodel in Greece, NY Near the Lake

    Some bathrooms do not just need a new look.

    They need a fresh start.

    That was the case for this upstairs guest bathroom in Greece, NY, located near the lake. The homeowner had an older tub and tile setup that no longer fit what they wanted from the space. Along with the outdated finishes, there were a few bigger issues that needed to be addressed, including plumbing updates, proper bathroom ventilation, wallpaper removal, and a water-damaged ceiling that needed repair.

    This project became much more than a simple surface update. Bathtub Made New completed a full bathroom remodel that included a tub to shower conversion, new shower walls and doors, a new vanity, new flooring, wall paint, ceiling repair, ventilation improvements, and a new shower valve.

    The result was a cleaner, brighter, more practical upstairs guest bathroom that feels updated, easier to use, and much more welcoming.

    The Problem: An Older Upstairs Bathroom That Needed More Than Cosmetic Updates

    This upstairs guest bathroom had several things working against it.

    The existing tub took up a large portion of the room, and the homeowner wanted to replace it with a walk-in shower. The old tub and tile surround were ready to come out, and the overall space needed to feel cleaner, more modern, and easier for guests to use.

    But the project also involved issues that went beyond the visible surfaces.

    The ceiling had water damage that needed to be repaired. The bathroom also needed proper venting, with the fan vented outside rather than allowing moisture to create future problems inside the home. Plumbing work was needed as part of the shower conversion, including a new valve. There was also wallpaper that had to be removed before the walls could be repainted.

    In other words, this was not just a “make it prettier” project.

    It was a full reset.

    For a bathroom near the lake, moisture control is especially important. Bathrooms already deal with steam, humidity, and frequent water exposure. When ventilation is not handled properly, small issues can turn into damaged paint, stained ceilings, mildew concerns, or long-term moisture problems.

    That is why this remodel focused on both appearance and function.

    The Goal: A Cleaner Walk-In Shower and a Fully Refreshed Guest Bathroom

    The homeowner wanted to replace the old tub with a walk-in shower that would better fit the way the bathroom was being used.

    The original tub space measured approximately 66 inches by 32 inches, giving the team a strong footprint to work with for the new shower. Instead of keeping a tub that was not serving the space well, Bathtub Made New removed the old tub and tile and created a more open, guest-friendly shower setup.

    The goal was to make the room feel:

    Cleaner

    More modern

    Better ventilated

    More comfortable for guests

    Easier to maintain

    More complete from floor to ceiling

    A walk-in shower with doors gave the bathroom a more practical layout while making the upstairs guest bath feel more updated.

    What Bathtub Made New Updated

    This Greece, NY bathroom remodel included several important updates throughout the room.

    Bathtub Made New removed the old tub and tile, completed the tub-to-shower conversion, built the third wall needed for the new shower layout, installed a new shower valve, added walk-in shower doors, repaired the water-damaged ceiling, vented the bathroom fan outside, removed wallpaper, painted the walls, installed new flooring, and updated the vanity.

    Each piece mattered.

    The shower was the main transformation, but the surrounding updates helped the entire bathroom feel finished. A new shower can look great, but if the ceiling, walls, floor, and vanity still feel outdated, the space will not have the same impact. This project worked because the entire room was brought forward together.

    The Tub to Shower Conversion

    The biggest change in this remodel was removing the old tub and replacing it with a walk-in shower.

    For many homeowners, especially in guest bathrooms, a tub is not always the most practical choice. A walk-in shower can make the bathroom feel more open, more accessible, and easier to use. It can also help modernize the room without needing to completely change the footprint.

    In this project, the tub area was already a generous size at approximately 66 by 32 inches. That gave the new shower a comfortable footprint while keeping the remodel efficient.

    Bathtub Made New removed the old tub and tile surround, made the necessary plumbing updates, installed a new valve, and built the third wall needed for the new shower design. The finished walk-in shower with doors gave the room a cleaner, more polished look.

    The result was a shower that felt intentional, not like a basic swap.

    Fixing the Ceiling and Improving Bathroom Ventilation

    One of the most important parts of this remodel was repairing the water-damaged ceiling and correcting the bathroom ventilation.

    This is the kind of work that makes a remodel better long after the photos are taken.

    A beautiful bathroom still needs to handle moisture properly. If steam and humidity are not being moved outside the home, the bathroom can develop ongoing issues with peeling paint, staining, mildew, or moisture damage.

    Bathtub Made New repaired the damaged ceiling and made sure the vent fan was properly vented outside. That helped protect the new finishes and gave the homeowner more confidence that the remodel was not just covering up an old problem.

    This is especially important in an upstairs bathroom, where water damage can affect surrounding areas if ignored.

    New Flooring, Paint, and Vanity

    Once the major shower and repair work was handled, the rest of the room came together with fresh finishes.

    The old wallpaper was removed, which immediately helped the space feel less dated. Fresh wall paint gave the bathroom a cleaner, brighter appearance and helped tie the remodel together.

    New flooring added another layer of transformation. Floors take up a lot of visual space in a bathroom, and replacing them can dramatically change how the room feels. Combined with the new vanity, the bathroom no longer felt like a partially updated space. It felt complete.

    The new vanity also improved both appearance and everyday function, giving guests a cleaner and more useful bathroom experience.

    Why This Remodel Worked So Well

    This project worked because it addressed the full bathroom, not just one feature.

    The homeowner did not simply replace an old tub and leave the rest of the room behind. The ceiling was repaired. The venting was corrected. The wallpaper was removed. The walls were painted. The flooring was updated. The vanity was replaced. The shower was redesigned.

    That full-room approach is what made the finished bathroom feel cohesive.

    A tub-to-shower conversion can make a big difference on its own, but when it is paired with flooring, paint, vanity updates, and moisture-related repairs, the whole bathroom feels renewed.

    This Greece, NY bathroom remodel is a great example of how a guest bathroom can be transformed into a cleaner, more comfortable space without changing everything about the home.

    A Better Guest Bathroom Near the Lake

    For this home near the lake in Greece, the upstairs guest bathroom is now more practical, more attractive, and better prepared for daily use.

    The walk-in shower replaced an old tub that no longer fit the homeowner’s needs. The new shower doors gave the space a polished look. The updated valve improved the shower function. The repaired ceiling and corrected venting helped address moisture concerns. The new vanity, flooring, and paint completed the room.

    Instead of an older bathroom with damage, outdated materials, and a tub that needed to go, the homeowner now has a refreshed guest bath that feels clean, finished, and much easier to enjoy.

    Thinking About a Bathroom Remodel in Greece, NY?

    If your bathroom has an outdated tub, damaged ceiling, poor ventilation, old flooring, or finishes that no longer fit your home, Bathtub Made New can help.

    Our team works with homeowners in Greece, Rochester, and throughout Monroe County on bathroom remodeling projects, tub to shower conversions, shower wall installations, bathtub refinishing, tile refinishing, vanity updates, flooring, and more.

    Whether you want to replace an old tub with a walk-in shower or refresh the entire bathroom, Bathtub Made New can help you create a space that looks better, functions better, and feels better to use.

    Contact Bathtub Made New today to talk about your bathroom remodel in Greece, NY or the surrounding Monroe County area.